University of Cambridge Computer Laboratory - WCDC electrical survey: core infrastructure at risk – Maintenance details
GPUs under maintenance
WCDC electrical survey: core infrastructure at risk
Completed
Scheduled for 30 January, 2025 at 09:00 – 16:00
Affects
Datacentres
Under maintenance from 9:00 AM to 4:00 PM
WCDC
Under maintenance from 9:00 AM to 4:00 PM
Updates
Completed
30 January, 2025 at 16:00
Completed
30 January, 2025 at 16:00
Maintenance has completed successfully
In progress
30 January, 2025 at 09:00
In progress
30 January, 2025 at 09:00
Maintenance is now in progress
Planned
30 January, 2025 at 09:00
Planned
30 January, 2025 at 09:00
Estates will be performing a survey of the electrical infrastructure in the West Cambridge Data Centre, which will require each of the two power feeds to our racks being individually powered down for short periods of time. All our equipment in these racks is redundantly powered from two feeds, and we do not anticipate any disruption; however we should consider our core infrastructure to be at risk during this work as we will be operating with no power redundancy; disruption would be possible during this work in the event of any problem with the data centre power infrastructure or with individual power supplies on our servers and network equipment.